back to previous page
TKL Pump Power Station
Fracture in power station cw pump required repairs to stop leakage and ensure cracks did not continue unabated. 8 sets of No.5 Metalocks were installed 4 deep with nickel screws interspersed between the locks. Copper pads underneath screws were used to ensure water tight seal. Works carried out over 2 days.