Industries
Cement
Food Processing
Locomotive [Trains]
Marine / offshore
Material Handling
Metal Forming [Press / Forge]
Mining, Quarries - Mineral processing
Petrochemical / refinery
Plastic
Power station / generation
Printing
Pulp & Paper
Reconditioners
Steel Industry
Sugar
Tyre industry [Rubber manufacturing]
Vintage / Heritage
Wire & Cable
 
Typical Applications
Compressors
Electric Motors
Engines/Cylinder Blocks
Gearboxes / casings
Generators
Pumps
 
 
     
 
Introduction Sitemap
 
     
 
Metalock Quote
 
     
 


View Metalock in a larger map
 
USED EQUIPMENT
 

back to previous page

Miscellaneous Jobs

1 Steam Locomotive cylinders – fractured – pretty standard metalock repair – though access is at arms length and parent bore thickness can vary widely.


2
 Bugatti Block cylinder fractured – new section machined up and metalocked into position – no heat / predictive results.


3
  Puffing Billy Climax Boiler Saddle [blast pipe casting] was corroded badly and fractured across neck. Flange section was removed and new piece machined / made up in cast iron and metalocked onto casting.


Bechstein Piano Frame – we probably average 3-4 a year – not just Bechstein but Steinway and             others.  Usually 2- 3 cracks per frame requiring a few locks per fracture. High tensile Nickel alloy is         used to maintain strength as they are under high load – tonality is unchanged.